Elie Sayegh Structural Engineering is a structural engineering firm in Orange, California. We engineer custom homes, additions and ADUs, commercial and industrial structures, solar and equipment structures, and temporary and event structures across Southern California. Residential · Renewables and equipment · FAQ
A Victorian counting house built onto the front of a building in the Gaslamp Quarter for the launch of the film Ebenezer at San Diego Comic-Con. It stood for ten days in July.
The facade is scenic wood flats hung on a 22 ft wide by 24 ft tall aluminum box truss frame. Nothing could be anchored into the building face, so the truss is braced back to the existing balcony rails and held at each column base with ballast for sliding. Wind design used the ASCE 37 reduction for a short temporary installation.
From the first model to a stamped set of drawings and calcs for the City of San Diego took under a week.
Read more about Scrooge & Marley at Comic-Con
A walk-through maze of the Backrooms, the endless yellow rooms of the internet legend, built inside a 3,700 sq ft building in Burbank for A24's launch of the film. It was open to the public for five days in May 2026.
The maze is scenic flats: 8 to 10 ft frames of 1x3 lumber faced with luan, doubled where a wall had to read thick and stacked with strongbacks up to 16 ft. The building could not be modified, so the walls brace off each other, off the existing walls, and up to the roof framing with clamped struts. The connections were detailed for staples so the shop could build fast.
The stamped plans and calculations went to the City of Burbank for a special event permit, with a week to install.
Read more about The Backrooms experience for A24
Post-tensioned slab on grade foundations for Summerstone, a tract of single-story homes in Marana, Arizona, delivered with TektonOS. Their homes go up from factory-built wall panels and trusses, so the slab has to be ready and exact on day one.
We designed the PT slabs for several plan types and took them through permit, then through a post-permit value engineering round to take cost out of the foundation. Tendon layouts were coordinated with the plumbing and the panel layout, which a robot prints directly onto the finished slab.
On the latest pilot, both slabs were printed in one day and the crew set walls and trusses for two homes the next.
Read more about Post-tensioned slabs for a housing tract
A walk-in Smurf mushroom house for a brand activation at the BET Experience in the Los Angeles Convention Center. One story, with a 14 ft tall foam roof cap built over welded wire hoops.
The set piece already existed, so we worked from as-built dimensions and photos rather than drawings, and drew the frame with looser tolerances to match what was actually built. We modeled it in RISA for vertical and seismic load and took it through the LADBS temporary structure permit for the convention center.
Read more about Smurf house at the BET Experience
A grower cooperative is moving its irrigation from open canals to pressurized pipe, and pressure costs power. The answer was to put the solar on top of the water: arrays on the metal roofs of two new reservoir covers, so no farmland comes out of production.
We engineered the solar attachment to the standing seam roofs, checking uplift through the clamps, the deck and the cover framing below, and the anchorage of the electrical equipment and its steel frames on the ground. The work ran from the first submittal in December 2024 through a construction set in August 2025.
The power the covers make pays for the pumping that fills them.
Read more about Solar on two reservoir covers
A steel ramp that lets a Mercedes G-Class climb a rock face on a studio backlot street, built for the Mercedes-Benz film The Rise of Electric. Sculpted rock hides the steel.
It started as a napkin sketch: HSS posts, a sloped deck of steel angles twice a tire wide, and a level landing for the front wheels. We ran the 25, 28, 30 and 32 degree options with the fabricator, modeled the frame in RISA, and designed it for a 6,500 lb vehicle with 2,000 lb on any one wheel, plus wind and seismic for an outdoor set.
The ramp sits on the slab with anchors, or on ballast where the lot cannot be drilled. It was tested with a stand-in SUV at the shop before going to set.
Read more about Rock climb ramp for the electric G-Class
A two-story custom home on a hillside lot in La Cañada Flintridge, among old oaks below the San Gabriel Mountains. Designed by Zohrabians Art of Design and built by PXG Development.
The site steps down to bedrock and part of the house sits over a backfilled pool, so much of the work happened below grade: reinforced masonry retaining walls bearing on rock, compacted fill, and a foundation laid out around the old pool. Above that is a wood frame with engineered floor joists, PSL beams where the openings get wide, and roof trusses.
We stay on through construction with site observations, RFIs and submittal reviews. Footings went in this September, and by November the frame was topped out with trusses and the walls sheathed.
Read more about Torosyan Residence
A single-story house on Orizaba Avenue in Paramount, remodeled through and enlarged: a new kitchen and living room, four bedrooms redone, and a new primary suite with its own bath, walk-in closet and pantry.
Old and new had to work as one structure. We tied the addition to the existing house with new shear walls, holdowns and anchors post-installed into the old foundation, carried the new roof on glulam and sawn ridge beams, and added pad footings and slab where the house grew. The patio and carport got their own calculation package.
We took the set through plan check in late 2023 and walked the framing on site for structural observation in early 2024.
Read more about Orizaba Avenue Residence